The waterfall model is a sequential design process, used in software development processes, in which progress is seen as flowing steadily downwards (like a waterfall) through the phases of Requirements, Analysis, Design,Coding, Testing,Production/Implementation
and Maintenance.
Advantages of Waterfall Iterative Model
2) In this model, output is generated after each stage (as seen before), therefore it has high visibility. The client and project manager gets a feel that there is considerable progress. Here it is important to note that in any project psychological factors also play an important role.
3) Project management, both at internal level and client's level, is easy again because of visible outputs after each phase. Deadlines can be set for the completion of each phase and evaluation can be done from time to time, to check if project is going as per milestones.
4) This methodology is significantly better than the haphazard approach to develop software. It provides a template into which methods of analysis, design, coding, testing and maintenance can be placed.
5) This methodology is preferred in projects where quality is more important as compared to schedule or cost.
Disadvantages of Waterfall Iterative Model of SDLC
2) It is often difficult to get customer requirements explicitly. Thus specifications can't be freezed. If that case arises baseline approach is followed, wherein output of one phase is carried forward to next phase. For example, even if SRS is not well defined and requirements can't be freezed, still design starts. Now if any changes are made in SRS then formal procedure is followed to put those changes in baseline document.
3) In this model we freeze software and hardware. But as technology changes at a rapid pace,such freezing is not advisable especially in long-term projects.
4) This method is especially bad in case client is not IT-literate as getting specifications from such a person is tough.
5) Even a small change in any previous stage can cause big problem for subsequent phases as all phases are dependent on each-other.
6) Going back a phase or two can be a costly affair.